Click on the link above to access Inspection Reports.
Call (867) 873-3800 for support if required.

Fire Prevention Services 2016 Ltd.

Search
Skip to content
  • Home
  • Services
    • ITM / Service and Repair
    • Extinguisher Training, Sales, and Service
    • Inspection Consulting and Auditing
    • Design, Supply, and Install
    • Obstruction Investigations
    • MIC, Corrosion Testing, and Treatment Programs
    • Engineering Reviews and Evaluations
    • Municipal Hydrant Flow Testing Programs
    • FPS Inspection, Testing, and Maintenance Training for Building Operators
    • FAQ
  • Portfolio
    • Projects
    • Clients
    • ITM – Inspection, Testing, and Maintenance
  • US !
    • Contact Us
    • Mission Statement
    • Our Team :)
    • Pics of US! – :)
  • Associations
  • Links
  • Employment Opportunities
    • Fire Alarm Inspector Yellowknife NT

ASTRA DV MAW

December 17, 2013 1668 × 1350 ASTRA DV MAW

Just a Neat Pic – Dry Valve

Previous Image
Next Image

PROTECTING WHAT MATTERS MOST

  • Fire Alarm
  • Extinguishers
  • Suppression
    • Wet Chemical (Kitchen)
    • Dry Chemical
    • Watermist
    • Clean Agent
    • CO2
    • Inert Gases
    • Marine, Off Road and Heavy equipment
    • Paint Booths
  • Sprinkler Systems
    • Residential Sprinkler Systems
    • About NFPA 25 Inspection Services
    • Wet and Dry Pipe Sprinkler Systems
    • Deluge / Preaction
    • Standpipe Systems
    • Watermist Systems
    • Foam Systems
      • Foam Sprinkler Systems
      • ICAFs
      • Hi-Lo Expansion Foam Systems
    • NFPA 25 Commentary and Supplementary Information
  • Fire Pumps
GNWT MUB, Inuvik NT
St. Judes Cathedral, Iqaluit NU
RTL Tank Farm, Yellowknife NT
Ekati Diamond Mine
Diavik Lac de Gras 2017
Heavy Metal
Unlocked door ……….
Fall Arrest Training :|
Clarke Training Facility, Cincinnati OH
3000 GPM
SRFN 3D
Diavik Diamond Mine
Snap Lake Diamond Mine
Spring on the Tundra, Jericho Diamond Mine
RTL Tank Farm, Yellowknife NT
Foam Sampling and System Testing
St. Judes ISO
St. Judes Aurora
3200 usg Foam Bladder Tank
Ice Pilots – Missed the cut.
Hydrant Flow Testing
Tank Farm Monitor Flow Testing
On to Eureka
Self Explanatory
Just a Neat Pic – Dry Valve
Foam Chamber Inspections
SL Powerhouse Foam System Bladder Tank Replacement 2014
Canadian High Arctic Research Station Cambridge Bay, Nunavut
CHARS Feb 2019
Proudly powered by WordPress